The next speaker will be Todd Saunders who is originally from Canada and is now working out of Norway.
03/01/2011 - 6:30 pm
Todd Saunders
Saunders Architecture, Norway
6:30 PM - Room 103
http://www.daniels.utoronto.ca/lectures/recent_works
25.2.11
24.2.11
event - Neighbourhood Maverick
At Harbourfront Centre until June 12th.
Exploring the insertion of modern homes into Toronto neighbourhoods.
http://www.harbourfrontcentre.com/visualarts/architecture_winter11.cfm
Exploring the insertion of modern homes into Toronto neighbourhoods.
http://www.harbourfrontcentre.com/visualarts/architecture_winter11.cfm
17.2.11
CB2 coming to Toronto
The spawn of Crate and Barrel will be located at Queen and Bathurst in Big Bop's old location:
http://www.cb2.com/Stores/Store.aspx?storeid=186
http://www.cb2.com/Stores/Store.aspx?storeid=186
11.2.11
information session for residents of Parkdale / Liberty Village
Public Open House for 3 Municipal Class Environmental Assessments
We invite you to drop-in to view project materials and speak one-on-one with project teams at this combined Public Open House:
Date: Tuesday, March 1, 2011
Time: 4:30 p.m. to 8:00 p.m.
Location: Liberty Noodle, 171 East Liberty St. (at Hanna Ave)
1. Dufferin Street Bridges
This study will determine how the bridges over the Gardiner Expressway and the Metrolinx/GO Transit rail corridor at Dufferin Street should be replaced. The preferred design will be presented at this second and final open house. The design follows the existing road alignment and will provide for the needs of all bridge users including pedestrians, cyclists, TTC, and motorists, in addition to GO Transit's planned expansion of the existing rail corridor.
2. New King-Liberty Pedestrian / Cyclist Link
This study will determine the location and design for a pedestrian/cyclist link across the CN/CP railway corridor between Atlantic Avenue and Strachan Avenue. Current design alternatives will be presented at this second open house.
3. Liberty Village New Street
This study will investigate the feasibility of constructing a new east-west street along the south end of Liberty Village. The new roadway would improve traffic circulation and provide community building opportunities in the area. This open house will present an introduction to the project.
We invite you to drop-in to view project materials and speak one-on-one with project teams at this combined Public Open House:
Date: Tuesday, March 1, 2011
Time: 4:30 p.m. to 8:00 p.m.
Location: Liberty Noodle, 171 East Liberty St. (at Hanna Ave)
1. Dufferin Street Bridges
This study will determine how the bridges over the Gardiner Expressway and the Metrolinx/GO Transit rail corridor at Dufferin Street should be replaced. The preferred design will be presented at this second and final open house. The design follows the existing road alignment and will provide for the needs of all bridge users including pedestrians, cyclists, TTC, and motorists, in addition to GO Transit's planned expansion of the existing rail corridor.
2. New King-Liberty Pedestrian / Cyclist Link
This study will determine the location and design for a pedestrian/cyclist link across the CN/CP railway corridor between Atlantic Avenue and Strachan Avenue. Current design alternatives will be presented at this second open house.
3. Liberty Village New Street
This study will investigate the feasibility of constructing a new east-west street along the south end of Liberty Village. The new roadway would improve traffic circulation and provide community building opportunities in the area. This open house will present an introduction to the project.
3.2.11
design career opportunity
Attention Interior Designers. Onni group is looking for team members for their development team focusing on projects in the GTA. more info here:
http://www.onni.com/pdf/career/InteriorDesigner-Toronto.pdf
http://www.onni.com/pdf/career/InteriorDesigner-Toronto.pdf
Subscribe to:
Posts (Atom)